Integrations

Plug into your existing stack

Robai links the robot controllers, PLCs, and cloud historians already used at your plant. No rip-and-replace.

Robot Protocols

Industrial protocols, ready to use

Robai uses the protocols your current equipment already supports. No proprietary middleware layer.

EtherCAT

Hard real-time fieldbus used for servo drive and I/O communication. Robai's edge unit operates as an EtherCAT master, reading encoder feedback and issuing joint position commands at 1kHz cycle rates.

PROFINET

Siemens PLC integration via PROFINET IO. Robai exposes a standardized IO device interface, so the line PLC can trigger task execution and receive task-complete signals without custom wiring.

ROS2

Native ROS2 topic and action server interface. Robai publishes joint states, subscribes to task-trigger messages, and exposes a ROS2 action interface for policy execution with feedback and preemption.

OPC-UA

OPC-UA server for MES and SCADA integration. Exposes task status, cycle count, fault codes, and performance metrics as addressable nodes. Supports subscriptions for real-time data push to historians.

MES and Cloud

Link to your manufacturing systems

Robai sends task telemetry to your manufacturing execution system and cloud historian without a custom integration project.

MES Connector

Sends work-order completion events, task duration, and fault codes to your manufacturing execution system. Works with REST-based MES APIs; no custom adapter required for common systems.

Time-Series Historian

Streams joint position, velocity, force, and task outcome data to your plant historian over MQTT or OPC-UA. Configurable sampling rates. Data stays within your network perimeter.

ERP Event Hook

Webhook-based integration sends task completion and exception events to ERP systems. Payload includes robot ID, task type, cycle time, and outcome. Works over standard HTTPS.

Air-Gap Mode

For plants with strict network isolation policies, Robai runs fully disconnected. Policy updates, telemetry export, and model management are handled by physical media transfer to the edge unit.

Need a specific integration?

Need another integration? Talk to us.

If your controller or system is not listed, contact engineering directly. Most new integrations take 2-4 weeks.